 B.C., Edna Bay Vancouver Island Air Beech 18 landing
|
 B.C., Edna Bay Oct. 2 - 7PM
|
 B.C., Edna Bay Oct. 4 - 9AM
|
 B.C., Edna Bay Tin to try to prevent dirt from washing down on the house siding
|
 B.C., Edna Bay Same
|
 B.C., Edna Bay A heavy load of boards for the ceiling. About 40% of what George has cut so far.
|
 B.C., Edna Bay Oct. 5, 7PM - interesting rosy light
|
 B.C., Edna Bay Oct. 5, 7PM - interesting rosy light
|
 B.C., Edna Bay Lumber wagon
|
 B.C., Edna Bay Lumber wagon
|
 B.C., Edna Bay The first load of ceiling boards cut to manageable length and sorted by length/width
|
 B.C., Edna Bay Another "shipment" from George
|
 B.C., Edna Bay Oct. 8 - 5:45PM
|
 B.C., Edna Bay Oct. 8 - 8PM
|
 B.C., Edna Bay Oct. 5 - 9:30PM Tug with tow
|
 B.C., Sonora Island Peter Genoux's place - off the island across from George and Hazel's
|
 B.C., Edna Bay George's second "shipment" moved from dock to wharf
|
 B.C., Edna Bay First shipment stacked for drying
|
 B.C., Edna Bay 95% of the lumber stacked for drying
|
 B.C., Edna Bay ... and the other 5%
|
 B.C., Edna Bay Oct. 12 - The day before Peter leaves for the winter
|
 B.C., Sonora Island NW from George and Hazel's
|
 B.C., Edna Bay 041012_02
|
 B.C., Edna Bay 041012_04
|
 B.C., Edna Bay 041012_05
|
 B.C., Edna Bay 041012_07
|
 B.C., Edna Bay 041012_08
|
 B.C., Edna Bay 041012_10
|
 B.C., Edna Bay 041012_11
|
 B.C., Edna Bay 041012_12
|
 B.C., Edna Bay 041012_13
|
 B.C., Edna Bay 041012_14
|
 B.C., Edna Bay 041012_15
|
 B.C., Edna Bay 041012_16
|
 B.C., Edna Bay 041012_17
|